First, the installation notes
1, installation notes
First, the machine should be installed in horizontal ground, no embedded anchor bolts.
This machine should be installed in a separate room (recommended to configure air conditioning), and should not be installed in the low temperature, high temperature, humidity, dust occasions.
The installation place should not have the ground vibration.
Fourth, the machine must be installed at the end of a selection process, namely after fine grinding or polishing.
Fifth, to prevent the electromagnetic interference field and nearby, so the user from the import pipe and exhaust pipe must be used iron pipes, no plastic pipe and other non metal pipe, and have a good grounding.
2, unpacking and inspection
Received after the machine should be careful when opening, to avoid unnecessary damage to the parts, integrity and inventory of parts and equipment.
3, mechanical installation
The machine should be installed on a solid platform with railings or hard ground (platform from the ground more than 1.6 meters), and should find the level, with the level of the machine to adjust the level of the machine up to 2/1000mm or less. The machine should be kept around for operation, inspection, maintenance, according to the specific circumstances of the site, the upper feed inlet corresponding to the user's feed pipe, the pipe and should be set flow control board and storage tank. Note that the feed line must not be pressed into the feed hopper of the machine, or the impact of the handling capacity.